New Hydrogen Test System Design and Feasibility Study

Source: www.gulfoilandgas.com 9/2/2022, Location: Europe

Our design engineers are underway with a hydrogen test system conceptual design and feasibility study for a Europe based industrial research and development institute with a worldwide network.

With regular planned review meetings working closely and collaboratively with our customer, the project is progressing through well structured strategic activities set out in a detailed time-bound schedule.

Our engineers are investigating and developing various design options, producing concepts and working through technical challenges, along with discussing manufacturing feasibility.

The design study will allow the engineers to develop and produce a detailed specification, propose an agreed scope of work and include a project schedule for the design, manufacturing and commissioning quotation, should the project be taken through to a purchase order.

KW engineers possess a wealth of experience and knowledge with design studies along with designing, manufacturing and commissioning high pressure, high temperature autoclaves with mechanical loading capabilities that are operational for a number of world-renowned aggressive environmental and materials testing laboratories.


Slovak Republic >>  3/20/2023 - McDermott has been awarded an engineering, procurement services and construction management (EPsCm) contract from Slovnaft, a.s., for the steam cracke...




Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.